Share Downtown Pedestrian Safety Study on FacebookShare Downtown Pedestrian Safety Study on TwitterShare Downtown Pedestrian Safety Study on LinkedinEmail Downtown Pedestrian Safety Study link
Project Description
The goal of the Downtown Pedestrian Safety Study is to review, analyze, and develop recommended improvements to increase pedestrian safety along travel ways and crossings in the study areas (see Safety Study Area Map) within the public right of way. The consultant has suggested recommended improvements to this specific study area (see Downtown Pedestrian Safety Feasibility Study).
Note that the corridor along SR 303 between Boston Mills Road and SR 91 was studied separately by the Ohio Department of Transportation (ODOT) and recommendations from that study are not included here. For more information on that study, go to SR 303 ODOT Safety Study.
Public Input
We want to hear from you! The City will hold a public meeting for the Downtown Pedestrian Safety Study to gather citizen comments. We also will be accepting comments online via this website through March 31.
Public Input Meeting - March 16, 2022
A public meeting will be held on March 16, 2022 from 6 p.m. to 8 p.m. in the City Hall Community Rooms, 1140 Terex Road, Hudson, Ohio.
Online Public Input (through March 31, 2022)
Can't attend the public meeting? We welcome your comments online here. Use the mapping application below to comment on various recommendations in the study. Comments will be accepted through March 31.
Questions?
Use the Questions section below and we will get back to you with a response to your requests, or email engineering@hudson.oh.us.
Project Description
The goal of the Downtown Pedestrian Safety Study is to review, analyze, and develop recommended improvements to increase pedestrian safety along travel ways and crossings in the study areas (see Safety Study Area Map) within the public right of way. The consultant has suggested recommended improvements to this specific study area (see Downtown Pedestrian Safety Feasibility Study).
Note that the corridor along SR 303 between Boston Mills Road and SR 91 was studied separately by the Ohio Department of Transportation (ODOT) and recommendations from that study are not included here. For more information on that study, go to SR 303 ODOT Safety Study.
Public Input
We want to hear from you! The City will hold a public meeting for the Downtown Pedestrian Safety Study to gather citizen comments. We also will be accepting comments online via this website through March 31.
Public Input Meeting - March 16, 2022
A public meeting will be held on March 16, 2022 from 6 p.m. to 8 p.m. in the City Hall Community Rooms, 1140 Terex Road, Hudson, Ohio.
Online Public Input (through March 31, 2022)
Can't attend the public meeting? We welcome your comments online here. Use the mapping application below to comment on various recommendations in the study. Comments will be accepted through March 31.
Questions?
Use the Questions section below and we will get back to you with a response to your requests, or email engineering@hudson.oh.us.
Downtown Pedestrian Safety Study is currently at this stage
The consultant will review, analyze, and develop recommended improvements to increase pedestrian safety along travel ways and crossings in the study areas.
Public Input - March 2022
this is an upcoming stage for Downtown Pedestrian Safety Study
.A public meeting will be held March 16, 2022 to gather citizen input on the proposed recommendations. Additionally, comments will be gathered online through Let's Talk Hudson.
Final Study Complete - Spring 2022
this is an upcoming stage for Downtown Pedestrian Safety Study
The final outcomes of the study after citizen input will be presented to City Council.
Final Recommendations
this is an upcoming stage for Downtown Pedestrian Safety Study